Episode 026 - Shut it Down - Decommissioning Pickering Nuclear Generating Station - a podcast by CEM Engineering

from 2020-06-24T12:55:36

:: ::

Matt Lensink chats with Carla Carmichael, VP Nuclear Decommissioning Strategy at Ontario Power Generation. The Pickering power generation station is on it's way to being shut down, and the land restored to it's original state. Carla talks about the strategy to make this a successful decommissioning, the future of nuclear power and so much more.




CEM Engineering


Ontario Power Generation

Further episodes of Energy Radio

Further podcasts by CEM Engineering

Website of CEM Engineering