December 15 - The Underwater Cable System Connection Key West to Havana was Started - a podcast by 43 Keys Media

from 2018-12-15T05:00

:: ::

From much of its early history, Key West stood in relative isolation due to the lack of regular mail service to the island, and the sporadic nature of the shipping supply channels which could easily be affected by storms and less than desirable weather. It wasn't until the end of the Civil War in this country that some enterprising businessmen decided to develop the undersea cable system to connect the US to other countries for Telegraph and Telephone calls. When the practicality of this type of communication was discovered, that's whenever people were on board to make it happen.

The underwater cable system connecting Key West to Cuba officially began construction in 1867, the submarine cables were laid by boat crews in six different sections. The cable was laid in up to 1000 feet of water in the waters of the Florida Straights and connected Key West to Havana. There are several historic cable huts still visible around Key West. One of the more well preserved huts, sits near the Southernmost Point. Another less preserved example is able to be seen in the area of the Mallory Square dock. Some efforts have been made to preserve these historic cable huts.

It wasn't until this underwater cable system was installed that the United States was finally able to be connected to another country for this type of communication. In 1867, after the first section was laid, Key West Mayor E.O. Gwynn and the Captain-General of Cuba Joaquin del Manzano exchanged greetings over the wire. Now that communication could be made with the outside world, it was quite expensive to actually utilize the service.

Initially, Congress had limited the cost of a telegram to $3.50 cents for each 10 words. Imagine that! Eventually, the cost of a telegraph to Havana cost $4 in gold, by 1870. Additional underwater cable lines were added to the system in 1871, 1873, 1875, 1919 and 1927. At the height of the communications boom for Key West there were six different lines that connected the island to various locations.

Between shipping mishaps, hurricanes and the harsh marine environment, the cables were constantly having to be repaired and replaced. The underwater cable system remained in use until the last segment connecting Key West to Havana failed in 1987.

And it was today, December 15th, 1930, that the German cable ship Neptun started laying a new telephone cable to Cuba. The Key West end of the cable landed at the foot of Waddell Street. The cable was jointly owned by American Telephone and Telegraph Company and the Cuban Telephone Company. This was the fourth cable between Key West and Havana. The ship to two days to complete the cables to Havana.

And that's what happened today in Key West history.

Today in Key West History is brought to you by 43 Keys Media. To learn more about our glorious and historical past visit http://43keys.com. This program, as well as others, are also available as an Alexa flash briefing. Just tell Alexa to "play Today in Key West History as my flash briefing."

 

Further episodes of Today in Key West History

Further podcasts by 43 Keys Media

Website of 43 Keys Media